Skip to document
This is a Premium Document. Some documents on Studocu are Premium. Upgrade to Premium to unlock it.

Quizzz

quiz chapter 8
Course

Introduction to supply chain and operations management (oper1420)

23 Documents
Students shared 23 documents in this course
Academic year: 2020/2021
Uploaded by:
0followers
2Uploads
2upvotes

Comments

Please sign in or register to post comments.

Preview text

Question 1 (1 point)

Saved Three inputs to MRP are: Question 1 options:

Planning Factors, Planned Orders, PAC Planned Orders, Gross Requirements, PAC BOM, Gross Requirements and Planning Factors Strategic Planning, Planned Orders, Open Orders Question 2 (1 point)

Saved The longer the production and supplier lead times, the longer the MRP record's planning horizon needs to be. Question 2 options:

  1. True
  2. False Question 3 (1 point)

Saved The process by which end items are grouped into product families is called: Question 3 options:

independent demand aggregation forecasting

disaggregation Question 4 (1 point)

Saved If a manufacturer had no inventory of any kind but had orders for 10 finished units of their sole product, their buyer would know what parts to order if they were supplied with a ___________. Question 4 options:

  1. bill of material
  2. backward schedule
  3. planning horizon order sheet
  4. rough-cut capacity plan

Question 5 (1 point)

Saved Gross Requirements are the output of : Question 5 options:

S&OP BOM MRP MPS Question 6 (1 point)

Saved Production activity control is responsible for: Question 6 options:

A chase production plan is appropriate in cases where it is more expensive to hold inventory than to constantly hire and fire workers. Question 9 options:

  1. True
  2. False Question 10 (1 point)

Saved PAC has the shortest timeframe of any of the business process stages. Question 10 options:

True False

Was this document helpful?
This is a Premium Document. Some documents on Studocu are Premium. Upgrade to Premium to unlock it.

Quizzz

Course: Introduction to supply chain and operations management (oper1420)

23 Documents
Students shared 23 documents in this course

University: Conestoga College

Was this document helpful?

This is a preview

Do you want full access? Go Premium and unlock all 4 pages
  • Access to all documents

  • Get Unlimited Downloads

  • Improve your grades

Upload

Share your documents to unlock

Already Premium?
Question 1 (1 point)
Saved
Three inputs to MRP are:
Question 1 options:
Planning Factors, Planned Orders, PAC
Planned Orders, Gross Requirements, PAC
BOM, Gross Requirements and Planning Factors
Strategic Planning, Planned Orders, Open Orders
Question 2 (1 point)
Saved
The longer the production and supplier lead times, the longer the MRP record's planning horizon needs
to be.
Question 2 options:
1) True
2) False
Question 3 (1 point)
Saved
The process by which end items are grouped into product families is called:
Question 3 options:
independent demand
aggregation
forecasting

Why is this page out of focus?

This is a Premium document. Become Premium to read the whole document.