Unit Qty Price Amount
Gravel (including gravel bed) cu.m. 10 1,500 15,000.00
Sand cu.m. 10 1,500 15,000.00
Cement (40kg) bag 73 260 18,980.00
48,980.00
10mm diameter rebars @ 6m pcs 95 148 14,060.00
pcs 12mm diameter rebars @ 6m pcs 30 213 6,390.00
pcs 16mm diameter rebars @ 6m pcs 45 379 17,055.00
kilos #16 tie wire kls 5 55 275.00
37,780.00
1.2m x 2.4m plywood (3 uses) pcs 4 710 2,840.00
2×2 lumber wood @ 82 pcs 34 360 12,240.00
common wire nails kls 5 80 400.00
15,480.00
concrete hollow blocks – 43 pcs 1000 15 15,000.00
Cement bag 40 260 10,400.00
Sand cu.m. 5 1,500 7,500.00
Hardiflex pcs 5 890 4,450.00
2×2 Wood lumber 82 pcs 15 360 5,400.00
Common nails kls 5 80 400.00
43,150.00
0.8m x 2.1m Solid Door
(with jamb and hardwares)
0.7m x 2.1m Hollow Door
(with jamb and hardwares)
1.7 m x 1.0m Sliding Window
(with jamb and hardwares)
0.5 m x 0.5m Awning Window
(with jamb and hardwares)
17,286.00
Cement bag 45 260 11,700.00
Sand cu.m. 5 1,500 7,500.00
19,200.00
16mm dia. Plain Bar cross bracing pcs 20 422 8,440.00
16 mm dia. Turn buckle pcs 20 142 2,840.00
100x100x 6mm Angular base plate pcs 10 1,890 18,900.00
50 x 50 x 5mm Angular Bar pcs 12 1,400 16,800.00
C-Purlins 1.2mm 2x4 pcs 40 600 24,000.00
Welding Rod box 3 2,340 7,020.00
unit
1
Plastering Works
Truss Works
2,500
4,323.00
unit
3
4,000
4,322.00
4,321.00
unit
1
9,000
4,320.00
unit
1
7,000
Openings
BILL OF MATERIALS AND COST ESTIMATES
Description
Concreting Works
Reinforcing Bars
Formworks
Masonry
Concrete Wall
Gable End
Page 1 of 2