Skip to document

538661411 - Plumbing notes

Plumbing notes
Course

BSCE

217 Documents
Students shared 217 documents in this course
Academic year: 2022/2023
Uploaded by:
0followers
1Uploads
1upvotes

Comments

Please sign in or register to post comments.

Related Studylists

Fellow

Preview text

FROM FLOOR ABOVE

FLOOR CLEANOUT

FURNISHED BY OTHERS

ELECTRICAL CONTRACTOR

BELOW GRADE

BELOW FLOOR

ABOVE FINISHED FLOOR

ABOVE CEILINGAC AFF

BF BG

EC

FBO FCO

FFA

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

CLINICAL SERVICE SINKCSS

EXPANSION TANKET

FROM ABOVEFA FROM BELOWFB

FROM FLOOR BELOWFFB

ELECTRIC WATER HEATEREWH

COMB. EMERGENCY EYE WASH/SHOWEREEWSH

EMERGENCY EYE WASHEEW

DISHWASHERDW

COMBINATION FIXTURECF

BOOSTER HEATERBH

DRINKING FOUNTAINDF

PLUMBING SYMBOLS & ABBREVIATIONS

NOTE: NOT ALL SYMBOLS ARE USED ON THIS PROJECT

BUILDING AUTOMATION SYSTEMBAS

BACKFLOW PREVENTION DEVICEBFP BETWEEN JOISTSBJ BOTTOM OF PIPEBOP BRITISH THERMAL UNITS PER HOURBTUH

CONDENSATECOND CONDENSATE PUMPCP

CONTROL VALVECV

DN DOWN

FPC FIRE PROTECTION SUBCONTRACTOR

ANNOTATION ABBREVIATIONS

FLOOR SINKFS WATER CLOSET

VENT THRU ROOF

VACUUM BREAKER

THERMOSTATIC MIXING VALVE

TO BELOW

PLUMBING CONTRACTOR

MOP SINK BASIN

LAVATORY

HOT WATER RECIRCULATION PUMP

HOSE BIBB (INTERIOR)

HIGH AS POSSIBLEHAP HB

HWCP

L

MSB

PC

TB

TMV

VB VTR WC WCO

SP SUMP PUMP

RD ROOF DRAIN

TO FLOOR BELOWTFB

TO FLOOR ABOVETFA

SH SHOWER

SERVICE SINKSS

LAUNDRY TUBLT

ICE MAKERIM

HANDWASHING SINKHWS

HOSE STATIONHS

SK SINK

THOUSANDS OF BTU PER HOURMBH

P PUMP

PRV PRESSURE RELIEF VALVE

RPZ REDUCED PRESSURE BFP

TOP TOP OF PIPE

NOT TO SCALENTS

SF SQUARE FOOT

SE SEWAGE EJECTOR

MECHANICAL CONTRACTORMC

ORD OVERFLOW ROOF DRAIN

GENERAL CONTRACTORGC

GPM GALLONS PER MINUTE

YARD CLEANOUTGCO

HWC

HW

3-WAY CONTROL VALVE ANGLE GATE VALVE ANGLE GLOBE VALVE BALANCING/SHUTOFF VALVE BALL VALVE BUTTERFLY VALVE

CHECK VALVE

CALIBRATED BALANCING VALVE

CONTROL VALVE

GATE VALVE GLOBE VALVE

QUICK OPEN VALVE SAFETY RELIEF VALVE SOLENOID VALVE

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

PIPING SYSTEM

GAS COCK

PLUG VALVE

PLUMBING SYMBOLOGY

PRESSURE REDUCING VALVE (WATER) PRESSURE REGULATOR (GAS)

P PROPANE GAS

ST STORM

PD PUMP DISCHARGE

OST OVERFLOW STORM OW OIL WASTE

W SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

V SANITARY VENT

OV OIL VENT

NPCW NONPOTABLE COLD WATER

CW DOMESTIC COLD WATER

DOMESTIC HW RECIRCULATION

DOMESTIC HOT WATER HW 140 DOMESTIC HOT WATER (OTHER TEMP.)

PIPE SLOPE ARROW

BACKFLOW PREVENTER HOSE BIBB / WALL HYDRANT

VACUUM RELIEF VALVE

PIPE ANCHOR PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE FLOOR CLEANOUT - ROUND OR SQUARE

PIPE CAP PIPE TURNING DOWN PIPE TURNING UP TEE UP TEE DOWN DROP AND RUN DROP AND TURN TEE OFF TOP TEE OFF BOTTOM CROSS AND RISER PLAN 90° ELBOW PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER FLOW SWITCH

TEMPERATURE SWITCH

OR OR CO

F P T

M

PLUMBING EQUIPMENT DESIGNATION

ANNOTATION SYMBOLOGY
PLUMBING KEYNOTE

L

DETAIL OR SECTION MARK SHOWN ON DRAWING

DETAIL MODULE NUMBER

#

EJECTOR SUMPES

WALL CLEANOUT

COLORADO SPRINGS, COLORADO 80907

####### GROUP

4755 FORGE ROAD, SUITE 150

09/12/

ELEVEN MILE PHASE 1 BID SET DRAWN: REVIEWED: DATE:

PROJECT NO.:

P0.

SH JB/CF

####### PLUMBING SYMBOLS & ABBREVIATIONS

PLUMBING GENERAL NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

WORK SHALL BE PERFORMED BY A LICENSED PLUMBER OF THE STATE OF COLORADO.

MATERIALS, INSTALLATION AND TESTING SHALL BE IN ACCORDANCE WITH THE LATEST ADOPTED EDITION OF STATE ANDLOCAL CODE PROCEDURES, METHODS AND REQUIREMENTS, INCLUDING THE MOST STRINGENT OF HEALTH AND SAFETY STANDARDS AS REQUIRED AND AS INTERPRETED BY THE AUTHORITY HAVING JURISDICTION. MINIMUM CODE AND STANDARDS REQUIRED, BUT NOT LIMITED TO THE FOLLOWING: "COLORADO STATE PLUMBING CODE" (2017 EDITION) "INTERNATIONAL PLUMBING CODE" (2015 EDITION) "NFPA 54 - NATIONAL FUEL GAS CODE" APPLICABLE LOCAL AND MUNICIPAL CODES AND ORDINANCES.

MEANING AND INTENT OF DRAWINGS: DRAWINGS ARE DIAGRAMMATIC. PIPING IS SHOWN IN SCHEMATIC FORM. SCALES INDICATED ARE FOR ARCHITECTURAL REFERENCE ONLY. IT IS NOT INTENDED THAT THE DRAWINGS SHOW EVERY WASTE, VENT, WATER PIPE, FITTING, SUPPORTS, ETC., AND IT IS UNDERSTOOD THAT THE DRAWINGS MUST BE FOLLOWED AS CLOSELY AS CIRCUMSTANCES WILL PERMIT, THE PROPER INSTALLATION ACCORDING TO THE TRUE INTENT AND MEANING OF THE DRAWINGS, LOCAL CODES AND STANDARD PRACTICES SHALL BE PROVIDED. PLUMBING CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO INSTALLATION. REPORT ANY PROBLEMS OR CONFLICTS TO THE ARCHITECT/ENGINEER. NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE DRAWINGS. ANY MINOR CHANGES IN LOCATION OF EQUIPMENT, WASTE VENT, WATER PIPE, ETC., FROM THOSE LOCATIONS SHOWN ON THE DRAWINGS, SHALL BE MADE WITHOUT EXTRA COST, IF SO DIRECTED BY THE ARCHITECT/ENGINEER BEFORE THE INSTALLATION IS MADE. A MINOR CHANGE IN LOCATION IS CONSIDERED TO BE WITHIN 5'-0" OF THE ORIGINAL INDICATED LOCATION. THE EQUIPMENT INDICATED ON THESE DRAWINGS INCLUDE ONLY THE MAJOR EQUIPMENT REQUIREMENTS. NOT WITHSTANDING, THE DETAILS PRESENTED IN THESE DRAWINGS VERIFY THE COMPLETENESS OF THE MATERIALS LISTS AND SUITABILITY OF DEVICES TO MEET THE INTENT OF THIS PROJECT. ANY ADDITIONAL EQUIPMENT OR MATERIAL REQUIRED, EVEN IF NOT SPECIFICALLY MENTIONED HEREIN SHALL BE PROVIDED WITHOUT CLAIM FOR ADDITIONAL PAYMENT; IT BEING UNDERSTOOD THAT A COMPLETE AND OPERATIONAL PLUMBING SYSTEM, SATISFACTORY TO THE ARCHITECT/ENGINEER AND THE OWNER SHALL BE PROVIDED. USE ONLY THE MANUFACTURER'S TESTED ASSEMBLIES.

ALL GENERAL NOTES ARE PART OF THIS CONTRACT.

ALL EXPENSES CARRIED BY THE ARCHITECT/ENGINEER IN TROUBLESHOOTING SYSTEM(S) PROBLEMS CAUSED BY INADEQUATE WORKMANSHIP, LACK OF TECHNICAL EXPERTISE OR OTHER FORMS OF POOR PERFORMANCE ON THE PART OF A CONTRACTOR, SHALL BE BORN BY THAT CONTRACTOR.

PLUMBING CONTRACTOR IS RESPONSIBLE FOR ALL SERVICES IN BUILDING AND TO 5'-0" BEYOND THE BUILDING CONSTRUCTION LINE. SITE UTILITY CONTRACTOR IS RESPONSIBLE FOR ALL OTHER PIPING.

COORDINATE ROUTING OF PIPING WITH ALL OTHER TRADES AND STRUCTURAL CONDITIONS TO AVOID ANY CONFLICTS AND ADVISE ARCHITECT/ENGINEER OF ANY POSSIBLE CONFLICTS. VERIFY EXACT LOCATIONS, ELEVATIONS, AND DIMENSIONS OF STRUCTURAL MEMBERS AND OPENINGS.

MAINTAIN A MINIMUM CLEARANCE OF 3'-0" IN FRONT OF ELECTRICAL PANELS AND 1'-0" EITHER SIDE FROM STRUCTURE TO STRUCTURE AND FLOOR TO STRUCTURE. ROUTE PIPING AROUND AND NOT DIRECTLY ABOVE ELECTRICAL PANELS. VERIFY CLEARANCE REQUIREMENTS WITH ELECTRICAL CONTRACTOR PRIOR TO INSTALLING PIPE.

INCLUDE IN BID, ALL LICENSE, PERMIT, INSPECTION AND OTHER FEES REQUIRED BY UTILITY COMPANIES OR AUTHORITIES HAVING JURISDICTION REQUIRED FOR COMPLETION OF WORK SO THAT NO UNEXPECTED ADDITIONAL EXPENSES ARE INTRODUCED TO OWNER.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

S.

PROMPTLY INFORM THE ENGINEER, IN WRITING, OF ANY DEVIATIONS IN THE CONTRACT DOCUMENTS FROM REQUIREMENTS OF LOCAL UTILITIES, MUNICIPALITIES, STATE OR FEDERAL LAWS AND REGULATIONS. PERFORM THE WORK IN ACCORDANCE WITH SUCH REQUIREMENTS AT NO ADDITIONAL COST TO THE OWNER.

PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS SPECIFIED AND INDICATED ON THE DRAWINGS.

DURING CONSTRUCTION PROCEDURES, THE ENTIRE WORK AREA SHALL BE CLEAN OF ALL DUST, DIRT AND OTHER DEBRIS BEFORE APPLICATION OF ANY NEW MATERIALS.

ALL VENTS FROM HORIZONTAL SOIL OR WASTE PIPE SHALL COME OFF TOP OR AT 45 DEGREE VERTICALLY FROM CENTER OF PIPE BEFORE OFFSETTING HORIZONTALLY TO RISER.

ALL VENT TERMINATIONS SHALL BE COORDINATED WITH BUILDING OPENINGS, AIR INTAKES AND AIR EXHAUST OPENINGS. ADJUST VENT THROUGH ROOF LOCATIONS TO COMPLY WITH APPLICABLE CODE AND TO BE IN THE LEAST VISIBLE EXTERIOR VIEWPOINT.

SUPPORT ALL NEW PIPING AND EQUIPMENT FROM STRUCTURE ABOVE AS REQUIRED. PLUMBING CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE DESIGN OF SUPPLEMENTAL STEEL AND PIPE SUPPORTS, INCLUDING REACTION LOADS TO PRIMARY BUILDING STRUCTURAL MEMBERS.

PLUMBING CONTRACTOR TO PROVIDE AND INSTALL NAIL PLATES WHERE PIPING PASSES THROUGH STUD(S) WITHIN 2" OF NAILING SURFACE TO PROTECT PIPE FROM NAILS OR DRYWALL SCREWS.

PLUMBING CONTRACTOR SHALL INSTALL HOT WATER DISTRIBUTION LOOP AND BRANCH SUPPLY PIPING AS CLOSE AS POSSIBLE TO THE HOT WATER INLET SIDE OF POINT OF USE THERMOSTATIC MIXING VALVE, INCLUDING FIXTURES WITH INTEGRAL MIXING VALVES, SO THAT THERE IS NO MORE THAN 10 LINEAR FEET DISTANCE. THIS SHALL BE IN SINGLE FIXTURE APPLICATIONS. LAVATORY HOT WATER PIPING SHALL BE INSTALLED SO THAT THERE IS A MAXIMUM DISTANCE OF 2 FT FROM THE THERMOSTATIC MIXING VALVE TO THE HOT WATER DISTRIBUTION PIPING PER C404 OF THE 2015 IECC. IN MULTIPLE FIXTURE APPLICATIONS BATTERIED IN WALL OR PIPE CHASES, THE HOT WATER SUPPLY PIPING SHALL BE AS CLOSE AS REASONABLY POSSIBLE TO THE FIXTURE CONNECTIONS.

ALL P-TRAPS FOR FLOOR DRAINS AND FLOOR SINKS SHALL BE DEEP SEAL TRAP FILLED WITH WATER. 2" TRAPS SHALL HAVE A 4" MINIMUM WATER SEAL, 3" AND LARGER SHALL HAVE A 5" WATER SEAL.

PLUMBING CONTRACTOR TO INSTALL, TEST, AND FIELD BALANCE APPROVED EQUIPMENT PER MANUFACTURER'S WRITTEN INSTRUCTIONS AND RECOMMENDATIONS.

COLORADO SPRINGS, COLORADO 80907

####### GROUP

4755 FORGE ROAD, SUITE 150

09/12/

ELEVEN MILE PHASE 1 BID SET DRAWN: REVIEWED: DATE:

PROJECT NO.:

P0.

SH JB/CF

####### PLUMBING GENERAL NOTES

BREAK ROOM 103

OFFICE 102

OFFICE 101

TOILETS 106

CORRIDOR 108

LOCKERS 105

EVIDENCE 104

CLOSET 109

SHOP 110

VEHICLE BAYS 111

ELECTRICAL 107

3"FS-

3"FS-

S-

L-

WC-

SH-

2"FD-

4"WCO-

4"W 1/4" PER FT SLOPE

4"W

2"V

2" V PIPING TO MIN 3" SIDE WALL VENT. TERMINATE VENT MIN. 10 FT ABOVE EXTERIOR GRADE AND PROVIDE WITH INSECT RESISTANT SCREEN.

3"W

2"V

2"V

3"W

EEW-

SS-

2"V

2"V

4"W

2"WCO-

4"FCO-

2"W

4"W

1

SCALE:

DWV PLUMBING PLAN

1/8" = 1'-0"

GENERAL NOTES

NORTH

A. SANITARY WASTE PIPING SHALL BE SLOPED AT 1/8-INCH PER FOOT MINIMUM FOR ALL PIPING 4-INCH AND LARGER AND AT 1/4-INCH PER FOOT MINIMUM FOR ALL PIPING 3-INCH AND SMALLER.

B. PLUMBING CONTRACTOR SHALL INSTALL APPROVED WATER HAMMER ARRESTORS IN WATER LINES, BOTH HOT AND COLD, SERVING BATTERY AND BACK TO BACK FIXTURE INSTALLATIONS IN PIPE SPACE AND PIPE CHASES AND SHALL BE ACCESSIBLE.

C. SEAL ALL EXTERIOR WALL PENETRATIONS AIR AND WATER TIGHT.

D. ROUTE ALL PIPING THROUGH STRUCTURAL ELEMENTS. COORDINATE PENETRATION SIZES AND LOCATIONS WITH STRUCTURAL. LOCATE ALL VALVES IN-BETWEEN JOISTS AND PROVIDE ACCESS PANELS FOR FULL VALVE ACCESSIBILITY. REFERENCE STRUCTURAL DRAWINGS.

E. SEE PLUMBING FIXTURE SCHEDULE FOR PIPE SIZING TO INDIVIDUAL PLUMBING FIXTURES.

F. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND INSTRUCTIONS.

COLORADO SPRINGS, COLORADO 80907

####### GROUP

4755 FORGE ROAD, SUITE 150

09/12/

ELEVEN MILE PHASE 1 BID SET DRAWN: REVIEWED: DATE:

PROJECT NO.:

P2.

SH JB/CF

####### DWV PLUMBING PLAN

GENERAL NOTES

  1. 4" W APPROX. 30" B.F., ROUTED IN INSULATED TRENCH TO (E) SEPTIC. REFER TO SITE PLAN.

  2. 2" W UP TO 2" FD IN THE MEZZANINE MECHANICAL EQUIPMENT ROOM FOR CONDENSATE. LOCATE FD FOR EASE OF MAINTENANCE ACCESS AND ADJACENT TO GAS FURNACE. 2" VENTING FROM FD IS TO BE ROUTED UNDER ROOF AND CONNECTED TO NEAREST MIN 2" V PIPING PRIOR TO ROOF PENETRATION.

1

2

PROVIDE HOLD-RITE WALL HUNG PLATFORM. (50-SWHP-W) OR EQUAL.

DIELECTRIC UNION (TYP)

VACUUM RELIEF VALVE

THERMOMETER (TYP)

FROM P-1, HWC PUMP

HOT WATER SUPPLY

TYPICAL STOP

COLD WATER SUPPLY

TW CW

CW

TMV-

TYPICAL LAVATORY

1

SCALE:

LAVATORY TMV DIAGRAM

NO SCALE

2

SCALE:

ELECTRIC WATER HEATER DIAGRAM

NO SCALE

3

SCALE:

WATER ENTRY DIAGRAM

NO SCALE

1-1/2" CW FOR BUILDING DISTRIBUTION

FROM SITE HYDRO-ACCUMULATOR TANK. SEE P5.

1-1/2" CW

ADJUST FOR MAXIMUM 60 PSIG DOWNSTREAM OF RPZ-

PRV-

RPZ-

PROVIDE ISOLATION VALVE MIN 36" AFF

TEMPERATURE GAUGE

PRESSURE GAUGE

LINE SIZED WATER METER

1" DRAIN VALVE

WATER HEATER (SEE SCHEDULE.)

SIZE INDICATED ON DRAWINGS

HW SUPPLY (SEE PLANS FOR CONT.)

TO ELECTRICAL POWER SOURCE (PROVIDED BY ELECTRICAL CONTRACTOR)

CW SUPPLY (SEE PLANS FOR CONT.)

SIZE INDICATED ON DRAWINGS

BALL VALVE (TYP 2)

CHECK VALVE (TYP 2)

EXPANSION TANK AMTROL (ST-5C)

TYPICAL A.S.M. RATED TEMPERATURE AND PRESSURE RELIEF VALVE. SET @ 120 PSI. PIPE FULL SIZE TO FLOOR DRAIN. PROVIDE 2" MINIMUM AIR GAP.

MIN 1-1/2" TALL, GALVANIZED, HDPE, OR ALUMINUM DRAIN PAN WITH 1-1/4" DRAIN. MAINTAIN MIN. 2" ANNUAL SPACE AROUND WATER HEATER.

ROUTE MIN 1-1/4" DRAIN LINE TO NEAREST FLOOR DRAIN. TERMINATE AT 9" AFF.

MOUNT TOP OF PLATFORM AT APPROX. 4' AFF.

COLORADO SPRINGS, COLORADO 80907

####### GROUP

4755 FORGE ROAD, SUITE 150

09/12/

ELEVEN MILE PHASE 1 BID SET DRAWN: REVIEWED: DATE:

PROJECT NO.:

P5.

SH JB/CF

####### PLUMBING DIAGRAMS

COLORADO SPRINGS, COLORADO 80907

####### GROUP

4755 FORGE ROAD, SUITE 150

09/12/

ELEVEN MILE PHASE 1 BID SET DRAWN: REVIEWED: DATE:

PROJECT NO.:

P6.

SH JB/CF

####### PLUMBING SCHEDULES

DOMESTIC PUMP SCHEDULE

TAG SERVICE LOCATION TYPE ARRANGEMENT FLUID GPM FT HD RPM HP VOLT/PH MANUFACTURER MODEL NOTES P-1 DOMESTIC HOT WATER CIRC FIRST LVL JANITOR RM DOMESTIC HOT WATER INLINE WATER 1 1 3250 1/40 115/1 TACO 003-SC4 1- NOTES:1. ALL STAINLESS STEEL CONSTRUCTION 2. HORIZONTAL INLINE MOUNTED CIRC PUMP WITH 24/7 PROGRAMMABLE LINE VOLTAGE TIMECLOCK CONTROLLER. 3. COORDINATE TIME CLOCK OPERATION SETTINGS WITH OWNER.

ELECTRIC WATER HEATER SCHEDULE

PLAN MARK MANUFACTURER MODEL

STORAGE IN GALLONS

RECOVERY GPH @ 100 DEG.

KW INPUT

NUMBER OF ELEMENTS VOLTS PHASE FLA

HEIGHT (IN.)

DIAMTER (IN.)

OPERATING WEIGHT (LBS.)

REMARKS

EWH-1 AO SMITH DSE-30 30 49 12 1 240 1 50 31 22 398 1- NOTES: 1. GLASS LINED VESSEL. 2. SET MAX OUTLET TEMPERATURE TO 140°F. 3. PROVIDE WITH LOW WATER CUT OFF FOR HEATING ELEMENTS.

PLUMBING PIPING MATERIAL SCHEDULE

SYSTEM TYPE MATERIAL SELECTION

DOM. CW ABOVE GRADE TYPE L COPPER DOM. HW ABOVE GRADE TYPE L COPPER DOM. HWC ABOVE GRADE TYPE L COPPER

SANITARY BELOW GRADE PIPING

CAST IRON, CISPI 301 HUBLESS OR HUB AND SPIGOT PIPING; OR ASTM D2665 SCHEDULE 40 PVC

SANITARY ABOVE GRADE PIPING TO FIXTURES (NOT IN PLENUM SPACES)

CAST IRON, CISPI 301 HUBLESS OR HUB AND SPIGOT PIPING; OR ASTM D2665 SCHEDULE 40 PVC

SANITARY VENT PIPING

CAST IRON PIPING OR PVC - NO PVC VENT PIPING ALLOWED IN RETURN AIR PLENUMS

NOTES: PROVIDE ALL DOMESTIC WATER SYSTEMS WITH ASTM B88 (ASTM B88M) PIPING, ASME B16 OR ASME B16. PIPE FITTINGS, SOLDER AND FLUX (IF USED) THAT COMPLY WITH NSF 61 AND NSF 372 FOR MAXIMUM LEAD CONTENT FOR COPPER PIPING INSTALLATIONS. PROVIDE ASTM D2564 SOLVENT FOR ANY PVC DRAIN PIPING.

IN ALL CASES REFER TO PLUMBING SPECIFICATIONS.

BUILDING GAS LOAD SCHEDULE

####### EQUIPMENT INPUT

####### (BTU/HR)

GF-1 60, MAU-1 600, UH-1 150, UH-2 30, IRH-1 60, IRH-2 60, IRH-3 125,

####### TOTAL 1,085,

NOTES SITE ALTITUDE ABOVE SEA LEVEL 8600 FT TABLE 402 (27) USED FOR PROPANE PIPE SIZING TOTAL DEVELOPED LENGTH 174 FT GAS PRESSURE SUPPLIED BY TANK 2 PSI MAX ALLOWABLE PRESSURE DROP 1 PSI

COLORADO SPRINGS, COLORADO 80907

####### GROUP

4755 FORGE ROAD, SUITE 150

09/12/

ELEVEN MILE PHASE 1 BID SET DRAWN: REVIEWED: DATE:

PROJECT NO.:

P6.

SH JB/CF

####### PLUMBING SCHEDULES

PLUMBING FIXTURE SCHEDULE

PLAN MARK FIXTURE DESCRIPTION AND REMARKS

MINIMUM INDIVIDUAL LINE SIZES COLD WATER

HOT WATER WASTE VENT ELEC

S-

SINK- ADA, COUNTER MOUNTED, SELF-RIMMING, 18 GAUGE 304 STAINLESS STEEL, 25 INCH x 21 INCH x 6-1/2 INCH DEEP, SINGLE COMPARTMENT, UNDERCOATED WITH THREE HOLE DRILLINGS ON 4" CENTERS. ACCEPTABLE MANUFACTURERS: ELKAY (LRAD252165PD), JUST MFG. MOEN, AMERICAN STANDARD. SINK TRIM: MANUAL, SINGLE LEVER FAUCET WITH 8 INCH COVER PLATE AND PULL DOWN SPRAYER. 1 GPM FLOWRATE. PROVIDE WITH TMV-1 SET TO 120°F MAX OUT TEMP. ACCEPTABLE MANUFACTURERS: KOHLER (K-7305-5A),DELTA, MOEN, AMERICAN STANDARD. ACCESSORIES: PROVIDE DRAIN LINE WITH MIN. 17 GAUGE OFFSET GRID STRAINER AND TAILPIECE WITH MIN. 17 GAUGE P-TRAP WITH INTEGRAL CLEANOUT. PROVIDE WITH ADA TRAP, STOP AND SUPPLY PROTECTORS IF UNDERCOUNTER PIPING IS EXPOSED. PROVIDE QUARTER TURN, SOLID BRASS, CHROME PLATED ANGLE STOPS WITH FLEXIBLE HOSE SUPPLIES AND CHROME PLATED WALL ESCUTCHEONS.

1/2" 1/2" 1-1/2" 1-1/2" N/A

SH-

SHOWER- WHITE, SMOOTH WALL, BARRIER FREE, L-SHAPED GRAB BAR, 3/4 INCH SKIRT, CENTER DRAIN AND GELCOATED SURFACE. ACCEPTABLE MANUFACTURERS: AQUATIC (1363BFSD) SHOWER VALVE: PRESSURE BALANCED MIXING VALVE SHALL BE FLUSH MOUNTED WITH CONCEALED PIPING AT ADA REQUIRED HEIGHT, SINGLE LEVER HANDLE AND INTEGRAL SCREWDRIVER STOPS. SET LIMIT STOPS AT 110°F, 2 GPM FLOW CONTROL, WITH COMBINATION SLIDE AND GRAB BAR. ACCEPTABLE MANUFACTURERS: AQUATIC (PART OF ADA PACKAGE), DELTA, AMERICAN STANDARD, SYMMONS, SPEAKMAN, LEONARD, POWERS. SHOWER TRIM: PROVIDE WITH SOAP DISH, BRASS DRAIN AND ADA COMPLIANT SHOWER CURTAIN. PROVIDE ADA SEAT IN LEFT HAND OR RIGHT HAND CONFIGURATION AS INDICATED ON DRAWINGS.

1/2" 1/2" 2" 2" N/A

SS-

SERVICE SINK- FLOOR MOUNTED ON 18 GAUGE, STAINLESS STEEL LEGS. PROVIDE WITH 18 GAUGE STAINLESS STEEL BASIN, 20 INCH x 16 INCH x 8 INCH DEEP. PROVIDE REINFORCING IN WALL FOR MOUNTING FAUCET SUPPORT BRACKET. ACCEPTABLE MANUFACTURERS: FLORESTONE ADVANCE TABCO (8-OP-16). MOP SERVICE BASIN TRIM: CHROME PLATED CAST BRASS VACUUM BREAKER SPOUT, 3/4 INCH HOSE THREADED OUTLET, PAIL HOOK WITH WALL SUPPORT, INTEGRAL SCREWDRIVER STOPS WITH COVERING CAPS, STRAIGHT SHANK WITH FLANGE AND CROSS TYPE HANDLES. PROVIDE WITH TMV-1 AND SET MAX OUTLET TEMPERATURE AT 120°F. ACCEPTABLE MANUFACTURERS: DELTA (28T9) ACCESSORIES: PROVIDE WITH 5 FEET OF 1/2 INCH PLAIN END REINFORCED RUBBER HOSE, HOSE CLAMP AND ADJACENT MOP HANGER.

1/2" 1/2" 3" 1-1/2" N/A

TMV-

THERMOSTATIC MIXING VALVE- LEAD FREE CONSTRUCTION, FOR SINGLE FIXTURE APPLICATION, ALLOWING DOWN TO 0 GPM. WITH INTEGRAL CHECK VALVES AND FILTER SCREEN. ACCEPTABLE MANUFACTURERS: WATTS (MODEL LFUSG-B) OR EQUIVALENT.

3/8" 3/8" N/A N/A N/A

TS-1 TRAP SEAL - ELASTOMERIC MATERIAL WITH TORTUROUS PATH. ASSE 1072 COMPLIANT MANUFACTURERS: SURE SEAL (SS2009V.) N/A N/A DWGSSEE N/A N/A

WC-

WATER CLOSET- ADA, FLOOR MOUNTED WITH 12 INCH ROUGH-IN, PRESSURE ASSISTED FLUSH TANK. PROVIDE WITH WHITE, VITREOUS CHINA, AND ELONGATED BOWL. UNIT SHALL FLUSH ON 1 GALLON OF WATER PER FLUSH AND MUST BE EPA WATER SENSE CERTIFIED WITH A MAP SCORE OF 1000 OR GREATER. APPROVED MANUFACTURERS: KOHLER (HIGHLINE, K-3519), AMERICAN STANDARD, ELJER, ZURN, CRANE, GERBER, TOTO. ACCESSORIES: PROVIDE WITH WHITE, OPEN FRONT SEAT LESS COVER WITH SELF SUSTAINING CHECK HINGES. COORDINATE VERTICALLY ADJUSTABLE CARRIER INSTALLATIONS WITH WALL THICKNESS PRIOR TO INSTALL. (ZURN, ZN1209-N4)

1-1/2" N/A 3" 2" N/A

WCO-

WALL CLEAN OUT - DUCO CAST IRON CLEANOUT TEE WITH GAS AND WATER TIGHT BRONZE PLUG, SMOOTH STAINLESS STEEL ACCESS COVER AND VANDAL PROOF SCREW. APPROVED MANUFACTURERS: JAY R. SMITH (4510), ZURN

N/A N/A DWGSSEE DWGSSEE N/A

WH-

WALL HYDRANT - CONCEALED, FREEZEPROOF WALL HYDRANT WITH HOSE CONNECTION AND BACKFLOW PREVENTER. ACCEPTABLE MANUFACTURERS: WOODFORD (B67)

3/4" N/A N/A N/A N/A

PLUMBING FIXTURE SCHEDULE

PLAN MARK FIXTURE DESCRIPTION AND REMARKS

MINIMUM INDIVIDUAL LINE SIZES COLD WATER

HOT WATER WASTE VENT ELEC

EEW-

EMERGENCY EYE/FACE WASH: 304 STAINLESS STEEL BOWL WITH CLEAR PLASTIC DUST COVER. 304 STAINLESS STEEL EYE/FACE WASH SPRAYER AND YOKE, WITH GENTLE FLOW. PROVIDE WITH 304 STAINLESS STEEL PIPING AND 316 SS, STAY OPEN BALL VALVE WITH 316 STAINLESS STEEL ACTIVATION HANDLE. WATER MUST FLOW AT 3 GPM MIN FLOW RATE. AND DRAIN TO THE SANITARY SYSTEM. ACCEPTABLE MANUFACTURERS: BRADLEY (S192140B2FFB0P), SPEAKMAN, HAWS, CHICAGO FAUCET, WESTERN. ACCESSORIES: PROVIDE WITH AN ASSE 1071 RATED THERMOSTATIC MIXING VALVE SET TO 85°F FOR SCALD PROTECTION, PROVIDE WITH REFLECTIVE TAPE ON PIPING.

1" 1" 1-1/2"MIN 1-1/2"MIN N/A

FD-

FLOOR DRAIN - DUCCO CAST IRON BODY WITH ROUND, POLISHED NICKEL-BRONZE FINISHED STRAINER, HEEL-PROOF GRATE, WITH ADJUSTABLE STRAINER HEAD. PROVIDE WITH TS-1. ACCEPTABLE MANUFACTURERS: JAY R. SMITH (2005) ZURN, WADE, OR JOSAM.

N/A N/A 2" 1-1/4"MIN N/A

FS-

FLOOR SINK - 8 INCH DEEP, CAST IRON BODY AND 12X12 INCH SQUARE AREA, HEEL-PROOF. PROVIDE WITH A HALF GRATE UNLESS OTHERWISE NOTED ON DRAWINGS. PROVIDE WITH TS-1. ACCEPTABLE MANUFACTURERS: JOSAM (49340A-NB SERIES), WADE, ZURN, OR JAY R SMITH.

N/A N/A 3" 1-1/2"MIN N/A

L-

LAVATORY- WALL HUNG, WHITE, VITREOUS CHINA, 20 INCH x 18 INCH, WITH 4 INCH CENTERS, CONCEALED ARM SUPPORTS, 4 INCH BACKSPLASH AND OVERFLOW MOUNTED AT ADA REQUIRED HEIGHT. ACCEPTABLE MANUFACTURERS: AMERICAN STANDARD (0355), KOHLER, ZURN, ELJER, CRANE, GERBER, TOTO. LAVATORY TRIM: MANUAL, SINGLE LEVER VALVE FAUCET. BRASS CONSTRUCTION, WITH CHROME PLATED FINISH, AND 0 GPM, VANDAL RESISTANT AERATOR. PROVIDE WITH TMV- AND SET MAX OUTLET TEMPERATURE AT 105°F. ACCEPTABLE MANUFACTURERS: ZURN (Z6955-XL-S-F-LL), DELTA , T&S BRASS, SPEAKMAN, CHICAGO FAUCET. ACCESSORIES: PROVIDE DRAIN LINE WITH MIN. 17 GAUGE OFFSET GRID STRAINER AND TAILPIECE WITH MIN. 17 GAUGE P-TRAP WITH INTEGRAL CLEANOUT. PROVIDE WITH ADA TRAP, STOP AND SUPPLY PROTECTORS IF UNDERCOUNTER PIPING IS EXPOSED. PROVIDE QUARTER TURN, SOLID BRASS, CHROME PLATED ANGLE STOPS WITH FLEXIBLE HOSE SUPPLIES AND CHROME PLATED WALL ESCUTCHEONS.

1/2" 1/2" 1-1/4" 1-1/2" N/A

PRV-

PRESSURE REGULATING VALVE- LEAD FREE, PROVIDE WITH PRESSURE AND TEMPERATURE GAUGES AT OUTLET. ACCEPTABLE MANUFACTURERS: WATTS (LF25AUB-Z3), ZURN, BELL AND GOSSETT

1-1/2" N/A N/A N/A N/A

RPZ-

REDUCED PRESSURE BACKFLOW PREVENTER - BRONZE SEATS AND STAINLESS STEEL TRIM. THE ASSEMBLY SHALL INCLUDE QUARTER TURN SHUT-OFF VALVES, TEST COCKS, AND WYE STRAINER. ACCEPTABLE MANUFACTURERS: WATTS (LF909QT).

1-1/2" N/A N/A N/A N/A

RWB-

RECESSED WALL BOX - 5 INCH x 6 INCH BOX CONSTRUCTED OF GALVANIZED STEEL WITH WHITE POWDER COAT FINISH. PROVIDE WITH QUARTER TURN, LOW LEAD COLD WATER SUPPLY CONNECTION AND INTEGRAL WATER HAMMER ARRESTOR. ACCEPTABLE MANUFACTURERS: OATEY (39140), GUY GRAY, PPP OR EQUAL. ACCESSORIES: VERIFY EQUIPMENT LOCATION AND ROUGH IN REQUIREMENTS. MOUNT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.

1/2" N/A N/A N/A N/A

Was this document helpful?

538661411 - Plumbing notes

Course: BSCE

217 Documents
Students shared 217 documents in this course
Was this document helpful?
FROM FLOOR ABOVE
FLOOR CLEANOUT
FURNISHED BY OTHERS
ELECTRICAL CONTRACTOR
BELOW GRADE
BELOW FLOOR
ABOVE FINISHED FLOOR
ABOVE CEILINGAC
AFF
BF
BG
EC
FBO
FCO
FFA
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
CLINICAL SERVICE SINKCSS
EXPANSION TANKET
FROM ABOVEFA
FROM BELOWFB
FROM FLOOR BELOWFFB
ELECTRIC WATER HEATEREWH
COMB. EMERGENCY EYE WASH/SHOWEREEWSH
EMERGENCY EYE WASHEEW
DISHWASHERDW
COMBINATION FIXTURECF
BOOSTER HEATERBH
DRINKING FOUNTAINDF
PLUMBING SYMBOLS & ABBREVIATIONS
NOTE: NOT ALL SYMBOLS ARE USED ON THIS PROJECT
BUILDING AUTOMATION SYSTEMBAS
BACKFLOW PREVENTION DEVICEBFP
BETWEEN JOISTSBJ
BOTTOM OF PIPEBOP
BRITISH THERMAL UNITS PER HOURBTUH
CONDENSATECOND
CONDENSATE PUMPCP
CONTROL VALVECV
DN DOWN
FPC FIRE PROTECTION SUBCONTRACTOR
ANNOTATION ABBREVIATIONS
FLOOR SINKFS WATER CLOSET
VENT THRU ROOF
VACUUM BREAKER
THERMOSTATIC MIXING VALVE
TO BELOW
PLUMBING CONTRACTOR
MOP SINK BASIN
LAVATORY
HOT WATER RECIRCULATION PUMP
HOSE BIBB (INTERIOR)
HIGH AS POSSIBLEHAP
HB
HWCP
L
MSB
PC
TB
TMV
VB
VTR
WC
WCO
SP SUMP PUMP
RD ROOF DRAIN
TO FLOOR BELOWTFB
TO FLOOR ABOVETFA
SH SHOWER
SERVICE SINKSS
LAUNDRY TUBLT
ICE MAKERIM
HANDWASHING SINKHWS
HOSE STATIONHS
SK SINK
THOUSANDS OF BTU PER HOURMBH
P PUMP
PRV PRESSURE RELIEF VALVE
RPZ REDUCED PRESSURE BFP
TOP TOP OF PIPE
NOT TO SCALENTS
SF SQUARE FOOT
SE SEWAGE EJECTOR
MECHANICAL CONTRACTORMC
ORD OVERFLOW ROOF DRAIN
GENERAL CONTRACTORGC
GPM GALLONS PER MINUTE
YARD CLEANOUTGCO
HWC
HW
3-WAY CONTROL VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALANCING/SHUTOFF VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CALIBRATED BALANCING VALVE
CONTROL VALVE
GATE VALVE
GLOBE VALVE
QUICK OPEN VALVE
SAFETY RELIEF VALVE
SOLENOID VALVE
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
PIPING SYSTEM
GAS COCK
PLUG VALVE
PLUMBING SYMBOLOGY
PRESSURE REDUCING VALVE (WATER)
PRESSURE REGULATOR (GAS)
P PROPANE GAS
ST STORM
PD PUMP DISCHARGE
OST OVERFLOW STORM
OW OIL WASTE
W SANITARY WASTE
CD CONDENSATE DRAIN
CA COMPRESSED AIR
V SANITARY VENT
OV OIL VENT
NPCW NONPOTABLE COLD WATER
CW DOMESTIC COLD WATER
DOMESTIC HW RECIRCULATION
DOMESTIC HOT WATER
HW 140 DOMESTIC HOT WATER (OTHER TEMP.)
PIPE SLOPE ARROW
BACKFLOW PREVENTER
HOSE BIBB / WALL HYDRANT
VACUUM RELIEF VALVE
PIPE ANCHOR
PIPE GUIDES
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
WYE STRAINER
WYE STRAINER W/DRAIN VALVE
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT - ROUND OR SQUARE
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
FLEXIBLE PIPE CONNECTOR
WATER METER
PUMP
AUTOMATIC AIR VENT
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
FLOW SWITCH
TEMPERATURE SWITCH
OR
OR
CO
F
P
T
M
PLUMBING EQUIPMENT DESIGNATION
ANNOTATION SYMBOLOGY
PLUMBING KEYNOTE
#
L1
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
##
#
EJECTOR SUMPES
WALL CLEANOUT
(719) 590-9194 / info@f-w.com
COLORADO SPRINGS, COLORADO 80907
GROUP
4755 FORGE ROAD, SUITE 150
0180930.00
09/12/18
ELEVEN MILE PHASE 1
BID SET DRAWN:
REVIEWED:
DATE:
PROJECT NO.:
P0.1
SH
JB/CF
PLUMBING SYMBOLS & ABBREVIATIONS